Luxury Product Data Architecture — Tiffany & Co
Luxury Product Data Architecture for Global Omnichannel Distribution
Tiffany & Co required a product data architecture capable of supporting omnichannel distribution across North America, Europe, and Asia-Pacific. Doctor Project delivered PIM scoping and product taxonomy design for 15,000+ SKUs spanning jewelry collections, high-jewelry, and seasonal capsules — each with distinct attribute models, photography standards, and localization requirements. The engagement covered full data model design, channel mapping, and technical specification for a headless-commerce-ready PIM deployment on Akeneo.

Managing Complex Luxury Product Data Across Global Channels
Luxury product data at Tiffany & Co is structurally different from standard retail catalogs. Each SKU carries gemological attributes, provenance data, country-specific regulatory descriptors, and channel-specific photography requirements. Legacy spreadsheet-based workflows created attribute inconsistency across channels, delayed time-to-market for new collections, and introduced brand integrity risks at the digital touchpoint. Localization for 8+ market zones required a structured override model — one that did not exist in the previous setup.

PIM Architecture, Taxonomy Design, and Headless Commerce Data Model
Designed a product data architecture anchored on Akeneo PIM as the single source of truth for 15,000+ SKUs across 8 product families. Defined taxonomy for jewelry, watches, and accessories with family-specific attribute models. Mapped data flows from creation to syndication: PIM to DAM to headless storefront to marketplace feeds. Delivered an enrichment workflow specification reducing estimated time-to-publish by 60% for new collections. Produced full technical specifications for the Akeneo implementation including channel configuration, locale setup, and API integration points.

Technology Stack
Akeneo PIM, headless commerce architecture, Azure DevOps, DAM integration (digital asset pipeline), luxury e-commerce data model design
.png)







