AI-Powered PIM Enrichment — Kingfisher Brico Dépôt
55,000-SKU Catalog Enriched with AI and Akeneo
Kingfisher is one of Europe's largest home improvement retailers, operating the Brico Dépôt brand across France. In early 2026, the group faced a critical product data challenge: a 55,000-SKU catalog with inconsistent enrichment, missing ETIM classifications, and no scalable process for bulk data operations. As PIM Program Lead, the engagement covered end-to-end AI-powered enrichment architecture within Akeneo PIM — from rule design to AI configuration and quality governance. The objective: reach 80% catalog coverage in under three months, without increasing headcount.
Scale Without Headcount: Enriching 55,000 SKUs for B2B Distribution
B2B product catalogs in the home improvement sector carry a specific complexity: ETIM technical classification, multi-channel attribute requirements, and strict normalization rules for professional buyers. Brico Dépôt's catalog had grown organically over years, with inconsistent data entry, incomplete technical attributes, and no programmatic enrichment workflow. Manual enrichment at this scale would have required a team of 10+ data operators working for six months. The challenge was to design an architecture that could produce quality product data at machine speed, without compromising accuracy or ETIM compliance.
200 AI Configurations, 950 Akeneo Rules, 80% Coverage Achieved
The solution combined deep Akeneo rule engine expertise with LLM-based enrichment configurations. 950 Akeneo automation rules were designed and deployed to handle attribute propagation, data normalization, and cross-channel publishing logic. 200 AI configurations were built to generate and validate product descriptions, technical attributes, and ETIM classifications at scale. By the end of the engagement, 80% of the catalog had reached the target enrichment threshold — a result that would have taken 6+ months of manual effort, delivered in under 12 weeks. The architecture is now reusable across Kingfisher group subsidiaries.
Technology Stack
Akeneo PIM, AI/LLM enrichment (GPT-4 / Claude), ETIM Classification Framework, Azure DevOps.
.png)




